WP_20150723_002 WP_20150723_004 WP_20150723_006 WP_20150723_009

We are now in the process of fitting the toothed belt drive pulleys which will transfer the power from the motor to the prop shaft. 
Once we have aligned and tested the drive configuration and checked that the belt tension, positioning is correct, we will mark out the holes for drilling so that the components can be securely fitted in place.
 Before the aluminium components are actually fitted however, we will remove them to be polished and finished with a coat of clear lacquer. 
Advertisements